Dishwasher drama – inside the world of dirty dishes

Posted by Jeffrey on Oct 7, 2009

When we were first designing our kitchen we really fell in love with the option that moved the sink over to the other side of the kitchen. Not only would this free up more counter space beside the range, but it would split up the two main work areas allowing more than one person to work simultaneously.

Well, in practice this has worked splendidly! But what this also meant was that the sink and dishwasher was visible from the rest of the main floor. So we would have to deal with potentially dirty dishes and an appliance in full view of company. To minimize the clutter we wanted to have a dishwasher that could take a custom panel that matched the rest of the millwork in the kitchen.

Custom panel hides dishwasher


The problem with this approach is that for the pleasure of installing a panel, most manufacturers charge significantly more than stock appliances. Why? I guess because they can. And, not all manufacturers have this option. So we quickly settled on two brands: Miele and Bosch.

We took a look at both and I honestly think that although each has its advantages and disadvantages, they are both solid machines. What really swung the pendulum in favour of the Miele was the third rack for cutlery (more on that in a moment) and the fact that we could get one that was a “scratch and dent” model for over 50% off the list price from MTC.

So I went to the showroom and ordered one for delivery. When it was delivered, the installer mentioned a few hints because Miele’s have a different installation method than others. As I mentioned previously, it was a good thing we got those tips because it was certainly somewhat less straightforward than I thought.

After first time we loaded it up and turned it on, we were sitting in our living room reading and at a certain point we both looked up and wondered if the thing was still on or if there was a problem and it had stopped. Well, no word of a lie, it was running, but it’s so quiet that we didn’t hear it! What a change from our old machine that was so loud we had to turn up the volume on the TV! The only time you can tell its going is during a drain cycle when the noise from the water rushing down the PVC drain pipes tells you that it’s still on.

It does however have quite a long cycle, which isn’t really a problem if you plan for it. I believe the manual says that the “normal” cycle is about 110 minutes! Additionally, with this type of dishwasher, there are no heating elements at the bottom to dry the dishes. Instead, the stainless walls retain heat which is radiated back into the drum and dries dishes by evaporation. If you open the unit just after it finishes, you’ll be greeted by pretty wet glasses and cutlery. So we typically turn it on in the evening and by morning things are usually pretty dry.

Speaking of glasses, a good rinse agent is mandatory! There is a separate compartment and a red indicator light if the reservoir is running low. Furthermore, its better not to use lots of dishwashing detergent or else the interior begins to smell a bit funky. I had to find that out by following a few online forums.

Three, count ‘em, three racks!


I really like the design of the racks and it has such a large capacity that it takes us a couple of days to fill. I’d rather fill the unit and run it once than run a few half empty loads but the problem with that is the inside starts to smell of whatever last nights dinner was! So I often just run a quick “rinse” if I know that we don’t have enough to run a full load.

It has a filter in the bottom that you have to check and clean manually (rather than an automatic one in most North American units). But its really no problem to get and and a quick rinse every few weeks gets out most things.

Filter is easy to clean


But just a word of warning- if you and your partner have “discussions” about how to load a dishwasher, you could find all sorts of things to argue about with this unit! For example, the third rack is for cutlery and supposedly the fastest method is to arrange all the knives together, the forks etc. so that when you unload, you just grab a handful and dump them into the drawer. So if you like this type of order (and your partner doesn’t) these discussions could degenerate quickly to a battle! Just warning you!

Cutlery rack-helpful or hindrance? Discuss!


Finally the big question: how well does it clean? Sorry to disappoint, but its just ok. Nothing startling, but ok. I eat oatmeal in the morning and not only do I have to scrape (as is recommended in the manual) but I have to rinse and scrub or else it gets baked on to the bowl. Even if I put them in and run it right away, it still gets baked on. I’ve tried a number of different locations and still the same problem. So I’ve learned to live with that because it does the other stuff so well. And it’s built in, so it’s not going anywhere for a while!

So there you have it- good looks, quiet, ok cleaning. And hopefully no more discussions about how to load cutlery.


1 comment - Latest by:

Looking at drywall compound (again, sigh…)

Posted by Jeffrey on Jun 12, 2009

Well, it looked like almost everything was done and then this happened….

Ripping out the backsplash. It had to be done….


hmmm… drywall compound as a backsplash?


Its not like we didn’t know, and I know its only a small setback but it has slowed us down somewhat in getting things back to a somewhat normal state around here. Luckily it wasn’t too messy today…

I think the electician will be back to hook up the dining room pendant and exterior light and finish off the rest of his work next week (when he gets back from Disneyworld). And I am getting some wood delivered so I can put up a pergola over the deck just outside the door, where it gets really hot in the sun. I figured, I had pretty much taken out the railing anyway, so I might as well extend the posts up and put in a sun shade. We shall see how that goes!


Are we close to finishing the reno? Not sure but I am hoping!

Posted by Jeffrey on May 22, 2009

After a great week of work last week (and frantic efforts to get us up and running for the long weekend) not too much happened this week. As it was a short week, the contractor was only here a few times to do some minor things. That’s usually the way it is when getting close to the finish: there are many small things to do and often they don’t make as big an impact as putting in the countertop.

So this week more handles got installed on the cabinet doors and some adjustments got made so the panel on the dishwasher can fit properly within the cabinet. Just a quick word for those intrepid souls who try to install their Miele dishwasher – when you cut the hole for the hoses to hook up to the supply and drain, make sure you get them as far back towards the wall as you can or, better yet, cut the hole close to the floor and bring them up through the bottom of the sink base. Reason? There is a cut-out on the bottom of the dishwasher that goes up about 6” that lets the hoses fit between the wall and the dishwasher and if the hole through the cabinet is too high, when the unit is pushed back, it will pinch the hoses. We did a lot of measuring before we pushed this one back so we knew where to cut the hole, but if you didn’t, you might be met with a nasty mess one morning.

Oh yeah, and the tile behind the sink is a bit rough. We are waiting to see what can be done (if anything) about it.

With the dishwasher panel in, the look is more seamless.


So next week I have to sand the patch in the ceiling, prime and paint it as well as the kitchen ceiling, paint the rest of the walls and put in all the baseboards. Oh yeah and paint the patches upstairs that the electrician drilled to run the track and rewire a few outlets. And still no word on a stucco contractor to patch the back of the house. I hope this doesn’t take weeks to get done, but really as long as we can get the stuff into the kitchen (and our furniture up from the basement) I will be extremely happy.

We can use the stove again!



1 comment - Latest by:

Counter is in – but back to the basement

Posted by Jeffrey on May 13, 2009

I didn’t think anything was going to be happening at the house this week because we were waiting for the countertop to be installed.  We were told that it would take 10 business days for the counter to be fabricated so understanding human nature I thought it would be fortunate if it did arrive on the 10th day.  Well as good luck would have it I was wrong!

Early this morning the contractor was at our house and I asked him why he was here.  He said that the countertop with showing up at any minute.  I was pretty surprised that it was showing up early and I helped him cleanup a bit of the kitchen in preparation for the installation.  I brought up the sink and they brought in the counter and it was a way to the races.

The countertop was fabricated with strips of plywood attached to the underside.  This is so that if the countertop ever has to be removed you can unscrew it from the cabinets without having to rip it right off.  It also helps to attach the dishwasher when that’s installed.

The installation went pretty smoothly was finished in about 45 minutes.  The only area where the installer had some problems was that the back corner under the window.  He had to take out a bit of drywall [only about ¼ inch] push the counter back enough to make it fit.

He then siliconed the under mount sink and pushed it into place against the underside of the countertop.  He just cut two pieces of wood to hold it in place underneath while it dried.  And then he applied a little bit of silicone to the joint between the countertop and the wall and that was it.  Off to the next job.

Sink finally out of basement in its proper place.


So now we have to wait hopefully only a day or two until the plumber can hook up the faucet and the drain on the sink.  He will also do the dishwasher at that time.  So that is why we’re back in the basement.  With no running water in the kitchen we have to go back downstairs to get water for cooking.

But with the counter and sink installed its really starting to look finished and the material looks fantastic with the cabinet color and the flooring.  It’s a quartz countertop from Hanstone and with the bits of quartz which reflect the light and the other subtle colors it picks up the browns and reds from the floor.

Countertop and doors make it look like a real kitchen!


Can’t wait for the appliances to go back in.


So now we’re getting to the part of the job where we have to make note of all the items that have to be completed [and a lot of them are mine].  Things that I have to do include  priming and painting the living room ceiling, installing new trim around the dining room window, priming and painting all the window trim and even repainting the stairs as they got a bit banged up over the past couple months.  I have to say it’s looking really good and I can’t wait for it to be done so we can enjoy having friends and family over again without having to wonder where the spatula is!


Finalizing construction drawings

Posted by Jeffrey on Mar 9, 2009

Since we signed the contract, we have been moving forward to get the schedule locked down and all of the drawings for the cabinets in place so they can be sent to the cabinet makers to get started.

On Friday I was supposed to finalize the drawings with my comments, but came down with brutal flu bug and stayed in bed basically for 36 hours. After the weekend [and feeling much better] I am going over to the contractor’s office today to co-ordinate. Just a few small things and confirming that we are all on the same page because its easier to make sure that things are aligned at the drawing stage rather than later on!

I have to also confirm the window size so I can order it from the same people who did the rest of the windows in the house. I am glad I waited to order it now as with a few changes, I think the width of the window changed and once you take possession of the goods, its not like you can return them.

On another note, I secured someone to take away the kitchen! I used this online board called FreeTOrecycle (which is a Yahoo Group) and put all the cabinets, etc (and the dishwasher) up and a fellow contacted me and said that this was exactly what he was looking for and will rent a truck to pick them up when we take them out at the end of the month. Its great because I didn’t want them going to the landfill if someone else could use them.

We also started packing away things from the rest of the main floor, because with the new floor going in, everything has to be out of the way for the floor removal and the new subfloor and 3/4″ hardwood installation. I met with the flooring contractor last week and he said that it would be 3 days to do all the work, which seems pretty quick, but hey lets be optimistic at this point!

So, all that being said, I have a few things to do to get everything kickstarted, but can’t wait to get this project underway!


We have contract!

Posted by Jeffrey on Feb 23, 2009

We got a draft copy of the contract today and after a few revisions, will be able to start the project! [Of course the first thing is putting a deposit down, but after that we will start.]

So now that we have pretty much locked down the scope of work, we have to figure out how to schedule the work to make the most sense. Because we are doing not just the kitchen, a few things have to happen first. Of course the floor will have to be done before the cabinets go in, but even before that the window should be removed and the new opening cut.

So I am using this online project planning software called wrike to help me get a sense of what order things need to happen. Now I just have to pass it by the contractor to see if it makes sense.


1 comment - Latest by:

Getting closer to starting kitchen renovation

Posted by Jeffrey on Feb 22, 2009

Its been a while since the last post and most of the time has been going over budget with the contractor and figuring out where to save a few dollars. I will do a few things that will save some money like taking up the old vinyl tile  in the kitchen and removing the cabinets and countertop, but really the big ticket items I am leaving to the pros.

We will have a lot of work to do just packing up the whole main floor of the house and finding somewhere to store the stuff because we are replacing all the hardwood throughout. I think we will take the opportunity to purge some stuff we’ve been hanging on to for a while which will help once we need to put it all back! [It will seem like we have increased our storage space!]

We agreed to move forward with this company who have been really great about going through the quote very thoroughly with us and even bringing in his subs to visit the house and discuss their work! So now we have to go and sign the contract and leave a deposit to begin the detailed  investigation for a few more areas, such as removing the current window and moving the opening over so we can get a proper run of uppers in.

Once this is done, I will order the window and hope there are no delays in getting it fabricated!