Its been a few days since we’ve had work on the house here. Last week Wednesday the flooring was finished and after some cleanup, the contractor came by Friday to put down some paper and masonite to protect the flooring.

It’s actually been a good break for us- a chance to catch our breath while we wait for the cabinets to arrive. I haven’t heard confirmation if they are on the truck, but I am crossing my fingers that they arrive towards the end of this week and they can start the work of installation.

I have a feeling that it may be a tricky install because in my last conversation with the contractor about the reframing of the back wall, he mentioned that the wall is about an inch out which will affect how the cabinets (especially the lowers) go in.

But we are really hoping that once the lowers go in we can get a temporary sink and faucet hookup and some plywood counters so at least we can start inhabiting the main floor of the house again. Its been a bit trying to prep food (well I haven’t really been too ambitious, mostly microwave reheating and toaster). It will be such a relief to get some things back into the cabinets and drawers. Here is what it looks like currently:

Wow! Where’d all this stuff come from? I’m so embarassed.


Compare that to how it looks when our stuff from the main floor isn’t all piled together.

Hmm.


And the baseboard arrived today from Central-Fairbank Lumber! I am installing it myself and the trim around the new window to save a bit of money. My neighbor told me that the profile of the original deep baseboard was still being produced and this saves me from having to get it custom milled. He even has a paint sprayer, so instead of priming and painting  with a brush, I will see if its possible to spray it on (outside) and save a ton of time. At least that’s the theory.