Last Friday the contractor put in a temporary sink just as we were leaving to go away for the weekend. Which was a great thing as we haven’t had water on the main floor for about 6 weeks. But as we were going out the door, I heard them say, “Wait its leaking!” This is not what you want to hear as you leave the house for two nights and you have newly installed hardwood floors. Hardwood and water; not a good mix.

But they of course found out where the leak was and replaced that connection so when we got home everything was dry!

Water in the kitchen- what a concept!


Its been really great to be able to use the kitchen to do basic stuff like wash and chop veggies without going up and down the stairs. Now that we are using the kitchen, we are really looking forward to when the countertop arrives and all the rest of the tasks can be done. Seems a bit strange that the countertop holds up most of the stuff required to complete the job, but when I saw the fabricator template using the cardboard, I understood that since the walls are not perfectly square there would be no sense to fabricating it then having to re-cut and fit it on site. Better to do as much as possible at the factory and do small (again, cross fingers) customizations on site.

I’ve spent a bit of time patching the damage from the electricians doing a bit of re-wiring in the upstairs hall. It made sense to do this extra now because they ran a feed up to the hall for the track lighting and we could then use that to put in an additional outlet in the office and replace an old one in the middle bedroom. I just hope I have enough paint (and that it hasn’t dried out) to paint over the drywall compound.

Today they are installing the range hood which is great because not only does that finish off one more task, but it gets that big box out of my basement where I’ve stored it for the past 3 months!

Categories
designreno