After a great week of work last week (and frantic efforts to get us up and running for the long weekend) not too much happened this week. As it was a short week, the contractor was only here a few times to do some minor things. That’s usually the way it is when getting close to the finish: there are many small things to do and often they don’t make as big an impact as putting in the countertop.

So this week more handles got installed on the cabinet doors and some adjustments got made so the panel on the dishwasher can fit properly within the cabinet. Just a quick word for those intrepid souls who try to install their Miele dishwasher – when you cut the hole for the hoses to hook up to the supply and drain, make sure you get them as far back towards the wall as you can or, better yet, cut the hole close to the floor and bring them up through the bottom of the sink base. Reason? There is a cut-out on the bottom of the dishwasher that goes up about 6” that lets the hoses fit between the wall and the dishwasher and if the hole through the cabinet is too high, when the unit is pushed back, it will pinch the hoses. We did a lot of measuring before we pushed this one back so we knew where to cut the hole, but if you didn’t, you might be met with a nasty mess one morning.

Oh yeah, and the tile behind the sink is a bit rough. We are waiting to see what can be done (if anything) about it.

With the dishwasher panel in, the look is more seamless.


So next week I have to sand the patch in the ceiling, prime and paint it as well as the kitchen ceiling, paint the rest of the walls and put in all the baseboards. Oh yeah and paint the patches upstairs that the electrician drilled to run the track and rewire a few outlets. And still no word on a stucco contractor to patch the back of the house. I hope this doesn’t take weeks to get done, but really as long as we can get the stuff into the kitchen (and our furniture up from the basement) I will be extremely happy.

We can use the stove again!


Categories
reno